LAST NEWS

 

The Operation Management of the Aktio-Preveza Sub sea Tunnel informs you that since 12/12/2003 TUV CERT Certification Body for QM-Systems of RWTUV Systems GmbHereby certifies in accordance with TUV CERT procedure that J/V TEO S.A. – AKTOR S.A. Management, Operation and Maintenance of Aktio – Preveza Undersea Tunnel/HELLAS has established and applies a quality system for :

  • Management of tunnels and Highways
  • Operation and Maintenance of E/M and automation systems for tolling installations
  • Operation and Maintenance of E/M systems for Highway tunnels
  • Design of products relevant of Highway users (tolling tickets, tolling cards).

An audit was performed, Report No. 2.5-2361/2003. Proof has been furnished that the requirements according to ISO 9001:2000/EN ISO 9001:2000 are fulfilled

 

TEO S.A.-AKTOR S.A. Company is committed, according to the ISO 9001:2000 requirements, to keep on with the procedures for the operation and maintenance of the sub sea tunnel, in order to secure safe passes for the drivers and goods, and to satisfy its customers needs. TEO S.A.-AKTOR S.A. Company is committed for the continuous improvement of the Quality Management system in its all level. Company’s principles/goals are:

 

  • Obtain a safe, comfortable and quick pass for the vehicles and goods through the Sub sea Tunnel
  • Create a substructure of technical knowledge in the company, relevant to the tunnel operation and maintenance.
  • Elaboration of the citizens complains taking the proper preventive or corrective actions
  • Evaluation of our collaborators/suppliers
  • Reduction of the non-comfirties, which have been observed during the company’s operation.
  • Financial and quality supervision of the tunnel’s operation., according to the Quality Management System and the company’s interests.
  • Reduction of the operation cost (keeping the quality in high levels) by reforming its actions or redefining its policy.
  • Elaboration of the company’s quality data and statistical analysis in order to give a clear picture of the operation, with only purpose the continual improvement of the project
  • Continual updating of the company about the technological progress in its action field
  • Personnel training, according to the company’s needs and the technological progress.
 
 

 
 
 

The new time schedule validate from May (01/05) until the end of September (30/09)

 

DANGEROUS GOODS VEHICLES :  06:30 – 07:00     -     21:00 – 21:30

 AGRICULTURAL MACHINERIES :    05:00 – 05:30     -     21:30 – 22:00 

 

DANGEROUS GOODS ARE NOT ALLOWED TO PASS THROYGH THE TUNNEL ON SATURDAY, SUNDAY AND ON HOLIDAYS

 

 


BICYCLES PASS THROUGH THE TUNNEL

The Operation Management of The Preveza- Aktio Crossing Tunnel informs anyone who is interested in bicycle pass through the tunnel, the following:

  • Any Tourist Agency that organizes bicycle tours in tourist groups and wish to pass through the tunnel has first to come into contact with the Operation Management (Tunnel’s Control Room, tel. 26820 61449 / 26820 61069). These kinds of passes are only taking place following a scenario on specific time and days using J/V’s special vehicles.
  • The company faces all the isolated cases of cyclist tourists who wish to pass through the tunnel in the same way, as mentioned above.

In this way the Operation Management of the tunnel contributes to the tourist activity in the area and at the same time protects the cyclists and the rest of the tunnel users.  

 

 

 

 

| LOCATION | CONSTRUCTION | ELECTROMECHANICAL EQUIPMENT | CONTROL ROOM |
| SERVICE BUILDINGS | DANGEROUS GOODS | FEE COST | HOME |