TRAFFIC MANAGEMENT EQUIPMENT - There are traffic lights consisting of three phase indicators (red, yellow, green) in the Aktio - Preveza ramps as well as traffic lights of 2 phases indicators (green arrow and red X) in each traffic lane in both entrances (Aktio side and Preveza side). There are variable speed limit signs in both Aktio and Preveza Traffic lights as well as speed limit signs can be controlled through the SCADA system, according to the traffic flow. Vehicle over height detector, in order to divert vehicles higher than 4,5m from entering the tunnel and cause damages to the equipment. Variable message signs of 18 characters are installed every 200m on the roof of the tunnel, giving visual messages to the drivers. Loudspeakers system of 16 zones is installed in the underground and sub sea section. Every zone includes 12 loudspeakers (total number of loudspeakers into the tunnel 192), for message announcement to the drivers. 19 motorized coloured cameras with pan/tilt/zoom/focus operation giving us the ability of a visual observation of the tunnel from the Control Room through 13 coloured monitors (19″). Inductive loops are installed every 160m in 2 pair teams in each traffic lane which are giving us through SCADA system, the following indications as, vehicles speed, reverse movement , vehicle’s stoppage and number of vehicles. |
|||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
SUB STATION - There are two sub stations, one in the Preveza Service Building and the other one in the Aktio Service Building, which are sharing the tunnel’s electrical loads.Every sub station includes two (2) three-phase distribution transformers (T/F) using as cooling medium oil, Nominal power 400KVA and transformation rate 20/0,4 KV. There are two (2) Diesel Generator Sets of nominal power 400KVA each, (one is reserve of the other) providing a back up power in a case of a power cut because of a failure on PPC electrical network. There are two (2) UPS of nominal power 60KVA each for the resumption of the critical loads. The total autonomy time provided by the UPS system in the max loads is about 30 minutes. Mid Voltage and Low Voltage Area |
||||||||||||||||||||||||||||||||
![]() |
![]() |
|||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||
|
LIGHTING - The lighting of the tunnel is automatically adjusted in relation to the day light through photo cameras and a system of inverted voltage transformers which are fluctuating the brightness intensity of the lights in threshold and transient light zones of the tunnel, succeeding the proper lighting level. |
||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||
|
Transient Zone is the section that follows the threshold zone in which the lighting level is gradually reduced, in order to give to the driver the time to adjust to the tunnel low lighting level (internal zone). Louvers have been constructed in tunnel’s entrances in order to reduce the daylight. The length of the louvers in each side is 75m, and is part of the threshold zone. Artificial lighting has been installed in the rest of the threshold zone in order to succeed the demanded brightness. We note that through the SCADA system we have the ability to operate manually the light levels from the Control Room, if it is necessary. |
||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||
|
PUMP STATIONS - There are two (2) drainage pump stations in both the Aktio and Preveza entrances and another one in the tunnel deepest (lower) section. |
||||||||||||||||||||||||||||||||
|
FIREFIGHTING PUMP STATION
-
The fire fighting
system is composed of two (2) electrical pumps and a jokey for the
counterbalance of
the pressure falling.
|
||||||||||||||||||||||||||||||||
|
FIRE DETECTION SYSTEM - There are two fire detection systems, one for the tunnel and a separate one for the Service Buildings. Tunnels’ fire detection. A linear fire detection cable on the roof of the tunnel, divided in four zones, detects the temperature increase transmitting a fire alarm signal to the Control Room. The tunnel (closed section- sub sea section ≈1600m), is divided into 4 fire detection zones, every 400m, A-B-C-D, from Aktio to Preveza side. In a case of an alarm, traffic lights in Preveza and Aktio automatically turn red and if funs are in operation, they stop automatically. Buildings Fire detection is operating through smoke, temperature differential and visual sensors. The alarm (signal) is displayed on a different firefighting board in the Control Room. |
||||||||||||||||||||||||||||||||
|
RADIO TRANSMITTAL SYSTEM - The Radio transmittal system is composed of, a radiating cable 7/8″ on the roof of the tunnel, which is used as an antenna and allows the communication in 3 channels (Police, Fire brigade, Maintenance team). The Receiving and Transmitting (R/T) antennas through mobile units are installed on the roof of Preveza Service Building and the electronic equipment in the Control Room, which includes the main system and the R/T channels |
||||||||||||||||||||||||||||||||
|
EARTHQUAKE CONTROL SYSTEM - The earthquake control system detects and reports any earthquake that occurs near the tunnels’ area, and is composed of the Measurement Sensors, in a case of movement of the joints (between the tunnels’ sections). The Force Balance Accelerometer. The Main monitoring system, which is wired with the installed equipment (this system collects all the measurements from the sensors and at the same time checks the equipments operation). The Software used for the measurements as well as for the production of alarm signals in a case of exceeding the predetermined limit values and finally the Connection Cables. |
||||||||||||||||||||||||||||||||
|
MAIN CONTROL - The signal cables are wired to 16 P.L.C.’s which through fiber optics transfer the data to a Main Control Unit, which is installed in the PLC Room in Preveza Service Building and from there through profibus to the SCADA system and the Mimic Panel |
||||||||||||||||||||||||||||||||
|